Rm-materials-handling VARIABLE SPEED CONTROLS ControlMaster NXT Service Uživatelský manuál Strana 37

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 53
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 36
R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325
-
5319
37/53
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.
6.2 Checks before the first run
1
Check that the main power is switched off.
2
When installing a new unit, disconnect the motor (U / T1, V /
T2, W / T3) cables to prevent damage to the frequency
converter.
Measure the insulation resistance of the motor windings
(each phase to ground). Insulation resistance requirement for
new motor:
Cold motor (10..40 °C): 5 M
Warm motor (40 °C or more): 1 M
If insulation resistance is less that requirement the motor
shall be dried.
3
Reconnect the motor cables and check the thightness of the
other cables.
4
Check that the external connections and selected control
parameters (switches) are set according to the application.
Zobrazit stránku 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 52 53

Komentáře k této Příručce

Žádné komentáře