Rm-materials-handling WIRE ROPE HOISTS Service Uživatelský manuál Strana 92

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 130
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 91
R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319
92/130
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.
Switch OFF the power supply to the crane.
Remove the shaft locking parts (8).
Remove the side plate fixing parts (11)
Extract the rope sheaves (10), sheave covers (9) and side plates (11).
Remove the cover plate (7)
Remove the locking ring (or nut) (6) and thrust bearing (5).
Extract the hook (3) from the bearing set (4).
Re-assembly:
Lubricate the thrust bearing and the hook shaft.
Insert the hook (3) into the bearing house (4) and re-assemble the thrust bearing (5) and the locking
ring (or nut) (6).
1
2
1
2
c_hobeas1a
Re-assemble the side plates (11), the rope sheaves (10), sheave cover (9) and shaft (8).
Tighten all fixing screws to the required torque.
Switch ON the power supply to the crane.
Raise the hook block. Carefully guide the rope with a gloved hand until the hook block hangs free
from the working platform.
If the lower limit switch has been adjusted, re-adjust to the correct position.
Test the operation of the hoist.
5.29.3 Return sheave assembly
Return sheave, 4-fall, 1-rope reeving, drum size φ 303/355/406 mm
c_sh04a_000046
2. Shaft
3. Sheave support
4. Rope sheave
5. Shaft set
Zobrazit stránku 91
1 2 ... 87 88 89 90 91 92 93 94 95 96 97 ... 129 130

Komentáře k této Příručce

Žádné komentáře